subject
Mathematics, 15.04.2021 18:00 Milanchik28

Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22 hours. How long would it take Paul and Matt to install the floor working together? 4 hours 9.9 hours 13.2 hours 30 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Find the unit rate for: 75% high-fiber chimp food to 25% high -protein chimp food.
Answers: 2
question
Mathematics, 21.06.2019 23:00
The value of cos 30° is the same as which of the following?
Answers: 1
question
Mathematics, 22.06.2019 00:30
What should be done to both sides of the equation in order to solve -5m = -40? a) multiply by -5. b) divide by -5. c) multiply by -40. d) divide by -40.
Answers: 2
question
Mathematics, 22.06.2019 01:00
The equation line of cd is y=-2x-2. write an equation of a line parallels to line cd in slope-intercept form that contains point (4,5)
Answers: 1
You know the right answer?
Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22...
Questions
question
Mathematics, 09.09.2019 03:10
question
Mathematics, 09.09.2019 03:10
question
Mathematics, 09.09.2019 03:10
Questions on the website: 13722366