subject
Mathematics, 25.09.2019 07:50 lopeznadia838

Achain saw requires 5 hours of assembly and a wood chipper 4 hours. a maximum of 40 hours of assembly time is available. the profit is $150 on a chain saw and $230 on a chipper. how many of each should be assembled for maximum profit?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Arianna is buying plants for her garden. she buys 15 flowering plants for $96. pink flowering plants sell for $8, and purple flowering plants sell for $5. how many pink flowering plants did arianna buy? i figured out the answer! the answer is 7. 8x +5y = 96 plug in 7 for x 8 (7) + 5y = 96 56 + 5y = 96 subtract 56 from both sides 5y/y = 40/5 y = 8 she bought 7 pink and 8 purple plants
Answers: 1
question
Mathematics, 21.06.2019 20:50
Write the equation in logarithmic form 8^x=64
Answers: 1
question
Mathematics, 21.06.2019 22:00
Which of these triangle pairs can be mapped to each other using a single translation? cof hn
Answers: 2
question
Mathematics, 21.06.2019 23:30
The triangle shown has a hypotenuse with a length of 13 feet. the measure of angle a is 20 degrees. and the measure of angle b is 70 degrees. which of the following is closest to the length, in feet, of line segment ac? no need to use a calculator to find the trig numbers. each function is listed below. 4.4 5 12.2 35.7
Answers: 2
You know the right answer?
Achain saw requires 5 hours of assembly and a wood chipper 4 hours. a maximum of 40 hours of assembl...
Questions
question
Mathematics, 22.05.2020 02:58
Questions on the website: 13722360