subject
Mathematics, 09.04.2021 03:40 rasv4799

A construction company needs to remove 4 3/4 tons of dirt from a construction site. They can remove 5/6 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Which best describes the transformation that occurs in the graph? a) dilation b) reflection c) rotation d) translation
Answers: 2
question
Mathematics, 21.06.2019 15:30
What is the best reason for jacinta to have a savings account in addition to a checking account
Answers: 1
question
Mathematics, 21.06.2019 19:30
Which statements are true? check all that apply. the line x = 0 is perpendicular to the line y = –3. all lines that are parallel to the y-axis are vertical lines. all lines that are perpendicular to the x-axis have a slope of 0. the equation of the line parallel to the x-axis that passes through the point (2, –6) is x = 2. the equation of the line perpendicular to the y-axis that passes through the point (–5, 1) is y = 1.
Answers: 1
question
Mathematics, 22.06.2019 00:30
An unknown number x is at most 10. which graph best represents all the values of x? number line graph with closed circle on 10 and shading to the right. number line graph with open circle on 10 and shading to the right. number line graph with open circle on 10 and shading to the left. number line graph with closed circle on 10 and shading to the left.
Answers: 1
You know the right answer?
A construction company needs to remove 4 3/4 tons of dirt from a construction site. They can remove...
Questions
question
History, 30.11.2020 22:30
question
Mathematics, 30.11.2020 22:40
Questions on the website: 13722360