subject
Mathematics, 07.04.2021 08:20 JeffTheGoat

A building contractor is to dig a foundation feet​ long, feet​ wide, and feet deep. The contractor pays ​$ per load for trucks to remove the dirt. Each truck holds cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:40
Which is the graph of f(x) = (4)x? image for option 1 image for option 2 image for option 3 image for option 4
Answers: 1
question
Mathematics, 21.06.2019 21:30
Damon makes 20 cups of lemonade by mixing lemon juice and water. the ratio of lemon juice to water is shown in the tape diagram. lemon juice\text{lemon juice} lemon juice water\text{water} water how much lemon juice did damon use in the lemonade? cups
Answers: 3
question
Mathematics, 21.06.2019 21:30
Look at triangle wxy what is the length (in centimeters) of the side wy of the triangle?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Find the missing dimension! need asap! tiny square is a =3025 in ²
Answers: 1
You know the right answer?
A building contractor is to dig a foundation feet​ long, feet​ wide, and feet deep. The contractor p...
Questions
question
Mathematics, 13.07.2021 22:30
Questions on the website: 13722363