The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects in workmanship and visual quality features are checked in this inspection. For the past 22 working days, 176 water heaters were inspected and a total of 924 nonconformities reported. (a) What type of control chart would you recommend here, and how would you use it?

(b) Using two water heaters as the inspection unit, calculate the center line and control limits that are consistent with the past 22 days of inspection data.

(c) What is the probability of type I error for the control chart in part (b)?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Find the slope of the line below . enter your answer as a fraction or decimal. use a slash mark ( / ) as the fraction bar if necessary
Answers: 3
question
Mathematics, 21.06.2019 17:30
Which expressions are equivalent to k/2 choose 2 answers: a k-2 b 2/k c 1/2k d k/2 e k+k
Answers: 2
question
Mathematics, 21.06.2019 23:00
Either enter an exact answer in terms of \piπ or use 3.143.14 for \piπ and enter your answer as a decimal.
Answers: 2
question
Mathematics, 21.06.2019 23:30
In order for the function to be linear, what must m be and why? m = 22 because the rate of change is 1. m = 20 because the rate of change is 3. m = 22 because the rate of change is -1. m = 20 because the rate of change is -3.
Answers: 2
You know the right answer?
The manufacturer wishes to set up a control chart at the final inspection station for a gas water he...
Questions
Questions on the website: 13722363