A factory process requires 3 steps to finish a product. The steps each have a mean completion time of p = 10 seconds and a standard deviation of o = 5 seconds. The time it takes to complete each step is independent
from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen product.
Find the mean of T.
ut =
seconds

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
If you could answer these your a life saver
Answers: 2
question
Mathematics, 21.06.2019 23:30
Asinusoidal function whose frequency is 1/6pi
Answers: 2
question
Mathematics, 22.06.2019 08:00
Name the property the equation illustrates 7+(4+4)=(7+4)+4
Answers: 2
question
Mathematics, 22.06.2019 08:00
If m eab = 195 and m ec = 75, what is the measure of edc?
Answers: 1
You know the right answer?
A factory process requires 3 steps to finish a product. The steps each have a mean completion time o...
Questions
question
Mathematics, 20.05.2021 07:10
question
History, 20.05.2021 07:10
question
Mathematics, 20.05.2021 07:10
question
Mathematics, 20.05.2021 07:10
question
Mathematics, 20.05.2021 07:10
question
Mathematics, 20.05.2021 07:10
question
Mathematics, 20.05.2021 07:10
Questions on the website: 13722367