subject
Mathematics, 06.04.2021 01:20 pamelperezz26

At the Jumping Jack cookie factory, quality assurance inspectors remove broken or otherwise defective cookies from a moving conveyor belt prior to packaging. Based on past studies, the plant manager knows that the inspectors eliminate 98% of the defective cookies at a conveyor belt speed of 9 feet per minute. As the belt speed increases, the factory can produce more cookies per hour, but at the cost of lower quality of the packaged product. Inspectors collect only 60% of defective cookies at a belt speed of 18 feet per minute. Make a graph with the belt speed on the x-axis and the corresponding inspection efficiency, in percent, on the y-axis. Graph the points (10, 98) and (18, 63).

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Given f(x) = 17-x^2what is the average rate of change in f(x) over the interval [1, 5]?
Answers: 2
question
Mathematics, 21.06.2019 17:20
Which functions shave a maximum and are transformed to the left and down of the parent function ,check all that apply f(x) = x2? p(x) =14 (x+7)2 + 1
Answers: 3
question
Mathematics, 21.06.2019 20:00
What does the sign of the slope tell you about a line?
Answers: 2
question
Mathematics, 22.06.2019 00:00
Y+ 2/y is it a polynomial in one variable or not? and if so, why?
Answers: 1
You know the right answer?
At the Jumping Jack cookie factory, quality assurance inspectors remove broken or otherwise defectiv...
Questions
question
Advanced Placement (AP), 29.07.2019 20:00
question
Mathematics, 29.07.2019 20:00
Questions on the website: 13722367