Mathematics, 01.04.2021 22:50 joannegrace4898
Task:
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish?
Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Hint:
y=mx+b (slope-intercept form)
x=time
y=distance
b=3200
Start & Finish: ??
Total length=3200ft
Answers: 2
Mathematics, 21.06.2019 16:40
What is the ratio of the change in y-values to the change in x-values for this function? a) 1: 13 b) 2: 5 c) 5: 2 d) 13: 1
Answers: 3
Mathematics, 21.06.2019 17:30
One integer is 8 times another. if the product is 72, then find the integers
Answers: 2
Task:
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the enginee...
Mathematics, 01.12.2019 00:31
Mathematics, 01.12.2019 00:31
Biology, 01.12.2019 00:31
Social Studies, 01.12.2019 00:31
English, 01.12.2019 00:31
Mathematics, 01.12.2019 00:31
History, 01.12.2019 00:31
History, 01.12.2019 00:31
English, 01.12.2019 00:31