subject
Mathematics, 26.03.2021 20:10 mandyt6058

Two girder designs are under consideration for a bridge for a 1,200-foot crossing. The first design is expected to result in a superstructure weight per foot of 22(S) + 800, where S is the span between piers. The second design should result in superstructure weight per foot of 20(S) + 1,000. Piers and two required abutments are estimated to cost $220,000 each. Let X = the number of piers plus abutments. The superstructure will be erected at a cost of $0.55 per pound. Choose the girder design that will result in a minimum cost and specify the optimum value for X. Hint: X must be an integer.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Which expression can be used to determine the slope of the line that passes through the points -6, three and one, -9
Answers: 3
question
Mathematics, 21.06.2019 17:30
What does x = in this equation x+3+2x=x+5
Answers: 2
question
Mathematics, 21.06.2019 22:00
Liz is shipping a package to her friend. the maximum weight of a medium flat-rate box is 20 pounds, including the box which weighs 6 ounces. write and solve an inequality to describe the possible weight in pounds, w, of the contents that liz will ship to her friend if she must use a medium flat-rate box. use the drop-down menus to explain your answer.
Answers: 2
question
Mathematics, 22.06.2019 00:30
Which of the following is the sum of 3 1/6 + 6 3/8?
Answers: 2
You know the right answer?
Two girder designs are under consideration for a bridge for a 1,200-foot crossing. The first design...
Questions
question
Social Studies, 04.02.2020 00:07
Questions on the website: 13722359