Answers: 3
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:20
Convert the number to decimal form. 12) 312five a) 82 b) 30 c) 410 d) 1560 13) 156eight a) 880 b) 96 c) 164 d) 110 14) 6715eight a) 53,720 b) 3533 c) 117 d) 152
Answers: 1
Mathematics, 22.06.2019 01:30
The actual length of side y is 22 cm. use the scale drawing to find the actual length of side x. a) 15.2 cm b) 17.1 cm c) 18.0 cm d) 28.3 cm
Answers: 1
Mathematics, 22.06.2019 02:00
Astore is having a sale in which all items are reduced by 20 percent. including tax, jennifer paid $21 for a pair of shorts. if the sales tax is 5 percent, what was the original price of the shorts
Answers: 1
Free points first one to answer will get brainliest :)...
Biology, 01.10.2019 12:10
Mathematics, 01.10.2019 12:10
Social Studies, 01.10.2019 12:10
History, 01.10.2019 12:10
History, 01.10.2019 12:10
Mathematics, 01.10.2019 12:10
Mathematics, 01.10.2019 12:10
Geography, 01.10.2019 12:10
Social Studies, 01.10.2019 12:10
Mathematics, 01.10.2019 12:10