subject
Mathematics, 25.03.2021 21:40 baller1216

The Loetschberg tunnel was built to connect Bern, Switzerland, with the ski resorts in the southern Swiss Alps. This was accomplished by the Swiss using one engineering company that started at the
north end and another company that started at the south end. Suppose the company at the north end
could drill the entire tunnel in 22.2 years and south company could do it in 21.8 years. How long would
it have taken the two companies to drill the tunnel?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 20:20
Aline passes through (1,-5) and(-3,7) write an equation for the line in point slope form rewrite the equation in slope intercept form
Answers: 1
question
Mathematics, 21.06.2019 21:30
Write 5(6x+4)-2(5x-2) in the form a(bx+c) where a,b and c integers and a> 1
Answers: 1
question
Mathematics, 21.06.2019 22:30
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
question
Mathematics, 22.06.2019 00:30
Round each of the decimals to the nearest hundredth a. 0.596 b. 4.245 c. 53.6843 d. 17.999
Answers: 2
You know the right answer?
The Loetschberg tunnel was built to connect Bern, Switzerland, with the ski resorts in the southern...
Questions
question
Health, 10.12.2020 18:10
question
Mathematics, 10.12.2020 18:10
question
Mathematics, 10.12.2020 18:10
Questions on the website: 13722363