subject
Mathematics, 07.11.2019 12:31 RivvytheFanboy6510

Aceramics workshop makes wreaths, trees, and sleighs for sale at christmas. a wreath takes 3 hours to prepare, 2 hours to paint, and 9 hours to fire. a tree takes 14 hours to prepare, 3 hours to paint, and 4 hours to fire. a sleigh takes 4 hours to prepare, 17 hours to paint, and 7 hours to fire. if the workshop has 127 hours for prep time, 104 hours for painting, and 133 hours for firing, how many of each can be made?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
After being rearranged and simplified, which of the following equations could be solved using the quadratic formula? check all that apply. a. 9% + 3x2 = 14 + x-1 b. -x+ + 4x + 7 = -32-9 c. 5x + 4 = 3x4 - 2 d. 2x2 + x2 + x = 30
Answers: 1
question
Mathematics, 21.06.2019 18:00
Sum is 17 and their difference is 3
Answers: 1
question
Mathematics, 21.06.2019 19:30
The length of a shadow of the building is 36m. the length of the pole, which is perpendicular to the ground, is 1.9m. the length of the pole's shadow is 1.52m. what is the height of the building?
Answers: 1
question
Mathematics, 21.06.2019 20:20
Tomas used 3 1/3 cups of flour and now has 1 2/3cups left. which equation can he use to find f, the number of cups of flour he had to begin with? f+3 1/3=1 2/3 f-3 1/3=1 2/3 3 1/3f=1 2/3 f/3 1/3=1 2/3
Answers: 1
You know the right answer?
Aceramics workshop makes wreaths, trees, and sleighs for sale at christmas. a wreath takes 3 hours t...
Questions
question
Mathematics, 02.02.2021 22:00
question
English, 02.02.2021 22:00
question
Mathematics, 02.02.2021 22:00
question
Mathematics, 02.02.2021 22:00
question
Biology, 02.02.2021 22:00
Questions on the website: 13722367