subject
Mathematics, 23.03.2021 19:30 Amyra2003

A construction company has to complete a project no later than three months from now or there will be significant cost overruns. The manager of the construction company believes that there are four possible values for the random variable X, the number of months from now it will take to complete this project: 2, 2.5, 3, and 3.5. The manager currently thinks that the probabilities of these four possibilities are in the ratio 1 to 2 to 4 to 2. That is, Pr(X=2.5) is twice as likely as Pr(X=2), Pr(X=3) is twice as likely as Pr(X=2.5) and Pr(X=3.5) = 1/2Pr(X=3).1

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:20
Pls brainliest will be awarded if answer is correct
Answers: 1
question
Mathematics, 21.06.2019 21:20
What is the area of a triangle with vertices at (-3 3) (-3,2) and (1,2)?
Answers: 1
question
Mathematics, 21.06.2019 22:10
Acompany manufactures three types of cabinets. it makes 110 cabinets each week. in the first week, the sum of the number of type-1 cabinets and twice the number of type-2 cabinets produced was 10 more than the number of type-3 cabinets produced. the next week, the number of type-1 cabinets produced was three times more than in the first week, no type-2 cabinets were produced, and the number of type-3 cabinets produced was the same as in the previous week.
Answers: 1
question
Mathematics, 21.06.2019 23:20
Which shows a reasonable estimation for 124% of 42 using the distributive property?
Answers: 1
You know the right answer?
A construction company has to complete a project no later than three months from now or there will b...
Questions
Questions on the website: 13722363