Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers still need to dig 1700 feet to finish the project. How much time does it take to complete the tunnel from start to finish? Will the engineers have enough time if the project was started in December 2020 and the deadline to finish the project was in August 2021? Please explain your answer for yes or no.
Answers: 2
Mathematics, 21.06.2019 14:30
Using the given statements, state whether the conditional statement is true or false. p: 7 + 1 = 0 q: 2 + 2 = 5 is p q true or false?
Answers: 1
Mathematics, 21.06.2019 19:00
Acompany that manufactures and sells guitars made changes in their product range. from the start they had 20 models. then they reduced the number of models to 15. as a result, the company enjoyed a 10% increase in turnover. - how much did the stock level change? in (%)
Answers: 2
Mathematics, 21.06.2019 22:00
Non-euclidean geometry was discovered when, in seeking cleaner alternatives to the fifth postulate, it was found that the negation could also be true a. true b.false
Answers: 1
Mathematics, 22.06.2019 04:00
Type the next three numbers in a sequence 80, 90, 85, 95, 90, 100, 95, 105
Answers: 1
Engineers are digging a 3200-foot-long tunnel at a constant rate. After 5 months, the engineers stil...
Geography, 21.06.2019 16:30
Mathematics, 21.06.2019 16:30
Mathematics, 21.06.2019 16:30
English, 21.06.2019 16:30
History, 21.06.2019 16:30
English, 21.06.2019 16:30
Business, 21.06.2019 16:30