subject
Mathematics, 18.03.2021 02:30 queentynaisa

A factory has two assembly lines, M and N, that make the same toy. On Monday, only assembly line M was functioning, and it made 900 toys.
On Tuesday, both assembly lines were functioning for the same amount of time. Line M made 300 toys per hour
and line N made 480 toys per hour. Line N made as many toys on Tuesday as line M did over both days.
Write an equation that can be used to find the number of hours, t, that the assembly lines were functioning on
Tuesday


A factory has two assembly lines, M and N, that make the same toy. On Monday, only assembly line M

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Arestaurant gives out a scratch-off card to every customer. the probability that a customer will win a prize from a scratch-off card is 25%. design and conduct a simulation using random numbers to find the experimental probability that a customer will need more than 3 cards in order to win a prize. justify the model for your simulation, and conduct at least 10 trials.
Answers: 1
question
Mathematics, 21.06.2019 18:30
Two angles are complementary. the large angle is 36 more than the smaller angle. what is the measure of the large angle?
Answers: 1
question
Mathematics, 21.06.2019 19:10
Girardo is using the model below to solve the equation . girardo uses the following steps: step 1 add 4 negative x-tiles to both sides step 2 add 1 negative unit tile to both sides step 3 the solution is which step could be adjusted so that gerardo's final step results in a positive x-value? in step 1, he should have added 4 positive x-tiles to both sides. in step 1, he should have added 3 negative x-tiles to both sides. in step 2, he should have added 4 negative unit tiles to both sides. in step 2, he should have added 1 positive unit tile to both sides.
Answers: 2
question
Mathematics, 21.06.2019 19:30
Asurvey of 45 teens found that they spent an average of 25.6 hours per week in front of a screen (television, computer, tablet, phone, based on the survey’s sample mean, which value could be the population mean? 2.3 hours 27.4 hours 75.3 hours 41.5 hours
Answers: 1
You know the right answer?
A factory has two assembly lines, M and N, that make the same toy. On Monday, only assembly line M w...
Questions
question
History, 07.10.2020 18:01
question
Mathematics, 07.10.2020 18:01
Questions on the website: 13722367