Mathematics, 18.03.2021 01:50 jahzz

The expected activity time in PERT analysis is calculated as: the weighted average of a, m, and b, with m weighted 4 times as heavily as a and b. the sum of the optimistic, pessimistic, and most likely times, divided by six. the simple average of the optimistic, pessimistic, and most likely times. the sum of the activity variances, divided by six. the sum of the optimistic, pessimistic, and most likely times.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Approximately how many more job openings are expected for security guards than pharmacy technicians? a. 2,000 b. 11,100 c. 21,000 d. 32,000
Answers: 1
question
Mathematics, 21.06.2019 15:00
The radical equation 2+√2x-3 = √x+7 has a solution set [x= a0} and an extraneous root x = a1.
Answers: 3
question
Mathematics, 21.06.2019 19:00
Atheater wants to build movable steps that they can use to go on and off the stage. they want the steps to have enough space inside so they can also be used to store props. how much space is inside the steps?
Answers: 1
question
Mathematics, 22.06.2019 01:00
Is the ordered pair (-10, 7) a solution to the equation y = 17 – x? yes or no
Answers: 1
You know the right answer?
The expected activity time in PERT analysis is calculated as: the weighted average of a, m, and b, w...