subject
Mathematics, 18.03.2021 01:20 trodmanmalachip2yn26

As a block of concrete is put under increasing pressure, engineers measure the pressure X at which the first fracture appears and the pressure Y at which the second fracture appears. X and Y are measured in tons per square inch and have joint density function fXY(x, y) = { 24x(1 - y) for 0 < x < y < 1
0 otherwise.
Calculate the average pressure (in tons per square inch) at which the second fracture appears, given that the first fracture appears at 1/3 ton per square inch.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
Which statement accurately explains whether a reflection over the x-axis and a 180° rotation would map figure acb onto itself?
Answers: 2
question
Mathematics, 21.06.2019 18:00
Ateacher noticed 5/8 of the students were wearing either blue shorts or white shorts. write two different ways this could be done.
Answers: 2
question
Mathematics, 21.06.2019 20:30
Martha has a deck of cards. she has lost some of the cards, and now the deck only contains nine spades, eleven diamonds, eight clubs, and twelve hearts. martha predicts that whenever she draws a card from the deck without looking, she will draw a club one-fifth of the time. which activity would best allow martha to test her prediction? a. randomly draw a card from the box and see if it is a club. b. randomly draw a card. then, continue to draw another card until all eight clubs are drawn. c. randomly draw and replace a card 120 times. then, observe how close to 30 times a club is drawn. d. randomly draw and replace a card 100 times. then, observe how close to 20 times a club is drawn.
Answers: 3
question
Mathematics, 21.06.2019 20:40
David estimated he had about 20 fish in his pond. a year later, there were about 1.5 times as many fish. the year after that, the number of fish increased by a factor of 1.5 again. the number of fish is modeled by f(x)=20(1.5)^x. create a question you could ask that could be answered only by graphing or using a logarithm.
Answers: 1
You know the right answer?
As a block of concrete is put under increasing pressure, engineers measure the pressure X at which t...
Questions
question
World Languages, 22.02.2021 16:30
question
Geography, 22.02.2021 16:30
question
Mathematics, 22.02.2021 16:30
question
History, 22.02.2021 16:30
question
Mathematics, 22.02.2021 16:30
Questions on the website: 13722363