subject
Mathematics, 13.03.2021 02:40 keilyjaramillo2870

Para fazer um serviço de operário leva 70 dias . Se trabalhou 25 dias num mês e 24 dias no outro mês , quantos dias faltam para ele terminar o serviço?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
Alength on a map is 7.5 inches. thescale is 1 inch: 5 miles. what is theactual distance? a 1.5 miles c 12.5 milesb 2.5 miles d 37.5 miles
Answers: 1
question
Mathematics, 21.06.2019 15:20
Classify the following triangle check all that apply
Answers: 2
question
Mathematics, 21.06.2019 16:30
Asequence {an} is defined recursively, with a1 = 1, a2 = 2 and, for n > 2, an = an-1 an-2 . find the term a241. a) 0 b) 1 c) 2 d) 1 2
Answers: 1
question
Mathematics, 21.06.2019 23:00
Agroup of three friends order a combo meal which includes two slices of pizza and a drink each drink is priced at $2.50 the combined total of $31.50 how much is the cost of a slice of pizza
Answers: 2
You know the right answer?
Para fazer um serviço de operário leva 70 dias . Se trabalhou 25 dias num mês e 24 dias no outro mês...
Questions
question
Mathematics, 22.07.2019 16:30
Questions on the website: 13722365