subject
Mathematics, 10.03.2021 01:00 autumn452392

A work crew spent four days paving a stretch of road. The table below shows the length of road paved each day.


A work crew spent four days paving a stretch of road. The table below shows the length of road pave

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
The random variable x is the number of occurrences of an event over an interval of ten minutes. it can be assumed that the probability of an occurrence is the same in any two-time periods of an equal length. it is known that the mean number of occurrences in ten minutes is 5.3. the appropriate probability distribution for the random variable
Answers: 2
question
Mathematics, 21.06.2019 20:30
Ateam has p points. p = 3w + d w = wins d = draws a) a football team has 5 wins and 3 draws. how many points does the team have?
Answers: 1
question
Mathematics, 21.06.2019 23:30
Find the directions in which the function increases and decreases most rapidly at upper p 0p0. then find the derivatives of the function in these directions. f(x,y)equals=x squared plus xy plus y squaredx2+xy+y2, upper p 0p0left parenthesis 1 comma negative 4 right parenthesis
Answers: 2
question
Mathematics, 22.06.2019 00:20
Match the following reasons with the statements given to create the proof. 1. do = ob, ao = oc sas 2. doc = aob given 3. triangle cod congruent to triangle aob vertical angles are equal. 4. 1 = 2, ab = dc if two sides = and ||, then a parallelogram. 5. ab||dc if alternate interior angles =, then lines parallel. 6. abcd is a parallelogram cpcte
Answers: 2
You know the right answer?
A work crew spent four days paving a stretch of road. The table below shows the length of road paved...
Questions
question
Mathematics, 15.04.2020 23:34
question
Mathematics, 15.04.2020 23:34
Questions on the website: 13722363