Mathematics, 28.02.2021 14:00 belmontes

If 20 men assemble 8 machines in a day, how many men are needed to assemble 12 machines in a day​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Zoe placed colored blocks on a scale in science class. each block weighed 0.8 ounces. the total weight of all the colored blocks was 12.8 ounces. how many blocks did zoe place on the scale? write and solve an equation to find the answer.
Answers: 2
question
Mathematics, 21.06.2019 21:30
(03.03 mc) choose the graph below that correctly represents the equation 2x + 4y = 24. (5 points) select one: a. line through the points 0 comma 6 and 12 comma 0 b. line through the points 0 comma negative 6 and 12 comma 0 c. line through the points 0 comma negative 12 and 6 comma 0 d. line through the points 0 comma 12 and 6 comma 0
Answers: 1
question
Mathematics, 21.06.2019 23:00
*segment an is an altitude of right ? abc with a right angle at a. if ab = 2root 5 in and nc = 1 in, find bn, an, ac.
Answers: 3
question
Mathematics, 22.06.2019 00:30
(c) a vine called the mile-a-minute weed is known for growing at a very fast rate. it can grow up to 0.5 ft per day. how fast in inches per hour can the mile-a-minute weed grow up to? show your work using the correct conversion factors.
Answers: 1
You know the right answer?
If 20 men assemble 8 machines in a day, how many men are needed to assemble 12 machines in a day​...
Questions
question
Mathematics, 30.01.2021 22:40
question
Mathematics, 30.01.2021 22:40
Questions on the website: 13722361