Mathematics, 23.02.2021 23:40 gabriellesmith1210
6. A factory has two types of machines.
• The factory has 6 cutting machines and 4 stamping machines.
• Each cutting machine cuts 105 parts every 3 minutes.
• Each stamping machine stamps 24 parts every 20 seconds.
Part A
How many parts can all 6 cutting machines cut in 1 minute?
A. 105 parts
B. 140 parts
C. 210 parts
D. 315 parts
Answers: 1
Mathematics, 21.06.2019 15:30
Asquare is dilated by a scale factor of 1.25 to create a new square. how does the area of the new square compare with the area of the original square? a)the area of the new square is 1.25 times the area of the original square. b)the area of the new square is 2.50 times the area of the original square. c)the area of the new square is 1.252 times the area of the original square. d)the area of the new square is 1.253 times the area of the original square.
Answers: 1
Mathematics, 21.06.2019 17:20
Read the situations in the table below. then drag a graph and equation to represent each situation. indicate whether each of the relationships is proportional or non-proportional. edit : i got the right answer its attached
Answers: 2
Mathematics, 21.06.2019 20:00
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 3
6. A factory has two types of machines.
• The factory has 6 cutting machines and 4 stamping machine...
Spanish, 26.07.2019 20:00
Mathematics, 26.07.2019 20:00
Chemistry, 26.07.2019 20:00
History, 26.07.2019 20:00
Physics, 26.07.2019 20:00
Arts, 26.07.2019 20:00
History, 26.07.2019 20:00
Health, 26.07.2019 20:00
Social Studies, 26.07.2019 20:00