An engineering company was hired to dig an underground tunnel directly from B.
158 ft
point A to point B, which was a distance of 1.4
miles. By mistake, however, they
tunneled from point A to point C. Then they tunneled from point C to point B. If
tunneling costs about $120 million per mile, about how much money was wasted?
your answer. (Note: 1 mile = 5,280 feet.)
Show how
you
found

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
1. what is the formula for finding the vertical distance between two points on a coordinate plane?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Complex numbers multiply √-4 * √-25 and show all intermediate steps. alternative notation is sqrt(-4) * sqrt(-25).
Answers: 1
question
Mathematics, 21.06.2019 19:00
What are the first 4 terms in the multiplication pattern given by the formula 2×4n
Answers: 1
question
Mathematics, 21.06.2019 19:30
Acollection of coins has value of 64 cents. there are two more nickels than dimes and three times as many pennies as dimes in this collection. how many of each kind of coin are in the collection?
Answers: 1
You know the right answer?
An engineering company was hired to dig an underground tunnel directly from B.
158 ft
p...
Questions
question
Mathematics, 13.07.2019 09:00
question
Mathematics, 13.07.2019 09:00
Questions on the website: 13722363