subject
Mathematics, 14.02.2021 08:20 YungKardon

A and B can do a piece of work in 10 days B and C can do it in 15 days a and c can do it in 20 days how long will they take to do it individually​

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 01:30
What is 60.9643790503 to 5 decimal
Answers: 1
question
Mathematics, 22.06.2019 02:30
The floor of a building consists of 3000 tiles which are rhombus shaped and each of it's diagonals are 45 cm and 30 cm in length. find the total cost of polishing the floor, if the cost per m² is rs. 4.
Answers: 1
question
Mathematics, 22.06.2019 05:00
Amanufacturing firm has been averaging 16.8 orders per week for several years. however, during a recession, orders appeared to slow. suppose the firm’s production manager randomly samples 31 weeks and finds an average of 15.6 orders with a standard deviation of 2.3 orders. using a 0.025 significance level, test whether the mean number of orders has decreased. type the full 5 step procedure into the answer box, then for multiple choice practice, answer the following: 1. what is the name and symbol of the parameter that you are testing? 2. what is the symbol and value of the point estimate of that parameter? 3. what distribution are you using to test this parameter? 4. what is the critical value? 5. what is the test statistic value? 6. what is the p-value?
Answers: 2
question
Mathematics, 22.06.2019 05:00
Matt makes a birdhouse.he needs 2 1/3 cans of paint for each birdhouse.he has 10 cans of paint.how many bird houses can be made? ( i need this answered in the next 9 hrs )
Answers: 1
You know the right answer?
A and B can do a piece of work in 10 days B and C can do it in 15 days a and c can do it in 20 days...
Questions
question
Mathematics, 27.02.2020 20:24
question
English, 27.02.2020 20:24
Questions on the website: 13722366