subject
Mathematics, 11.02.2021 21:20 genyjoannerubiera

In a manufacturing plant, a work center is a specific production facility that consists of one or more people and or machines and is treated as one unit for the purposes of capacity requirements planning and job scheduling. If the jobs arriveat a particular work center at a faster rate than they depart, the work center impedes the overall production process and is referred to as a bottleneck. This sample was collected by an operations manager for use in investigating a potential bottleneck work center. There are 315 hours in the work week when items can come into the work center. The manager selects every 15th hour and counts how many items come into the work center during that hour. What type of sample is this?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Which is the length of the hypotenuse of the triangle a. 94ft b. 214 ft c. 33ft d. 37 ft
Answers: 1
question
Mathematics, 21.06.2019 17:50
For what values of x is x2 + 2x = 24 true?
Answers: 2
question
Mathematics, 21.06.2019 18:30
Which statement describes surface features called maria on the moon
Answers: 3
question
Mathematics, 21.06.2019 23:30
Find │–14│ a. 14 b. –14 c. start fraction 1 over 14 end fraction
Answers: 2
You know the right answer?
In a manufacturing plant, a work center is a specific production facility that consists of one or mo...
Questions
question
Mathematics, 22.04.2020 18:32
Questions on the website: 13722367