One of the assumptions underlying the theory of control charting is that successive plotted points are independent of one another. Each plotted point can signal either that a manufacturing process is operating correctly or that there is some sort of malfunction. Even when a process is running correctly, there is a small probability that a particular point will signal a problem with the process. Suppose that this probability is 0.05. What is the probability that at least one of 10 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.) What is the probability that at least one of 45 successive points indicates a problem when in fact the process is operating correctly? (Round your answer to three decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
How to solve it and what thw answer is
Answers: 2
question
Mathematics, 21.06.2019 14:30
The multiplication property of zero states that the product of any number and 0 is 0. what must be true about either a or b to make ab=0
Answers: 1
question
Mathematics, 21.06.2019 17:40
Atriangle has an area of 72 square inches. if the base of the triangle has a length of 18 inches, what is the height of the triangle? use the formula for the area of a triangle: area = (base)(height) type a numerical answer in the space provided. do not include the units or spaces in your answer.
Answers: 1
question
Mathematics, 21.06.2019 19:20
What is the measure of ac? 5 units 13 units 26 units 39 units 3x- 2b 6x + 9
Answers: 2
You know the right answer?
One of the assumptions underlying the theory of control charting is that successive plotted points a...
Questions
question
Mathematics, 25.04.2020 03:09
Questions on the website: 13722359