subject
Mathematics, 02.02.2021 03:20 princesincer9256

The density and strength of concrete are determined by the ratio of cement and aggregate (aggregate is sand, gravel, or crushed stone). Suppose that a contractor has 560 ft of a dry concrete mixture that is 60% sand by volume. How much pure sand must be added to form a new mixture that is 80% sand by
volume?
The contractor needs
ft of pure sand to form the resulting mixture.
X

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which multiplicative property is being illustrated below? (type commutative, associative, or identity) 5 × 2 × 4 = 2 × 5 × 4
Answers: 1
question
Mathematics, 21.06.2019 17:00
Adifferent website gives the cost for the first train as £56.88 and the second train as £20.11 with a £9.50 charge for cycle storage for the whole trip. how much would the journey cost you?
Answers: 1
question
Mathematics, 21.06.2019 17:00
What is the y intercept of f(x)=(1/2)^x?
Answers: 1
question
Mathematics, 21.06.2019 17:20
Which functions shave a maximum and are transformed to the left and down of the parent function ,check all that apply f(x) = x2? p(x) =14 (x+7)2 + 1
Answers: 3
You know the right answer?
The density and strength of concrete are determined by the ratio of cement and aggregate (aggregate...
Questions
question
English, 15.10.2019 11:00
question
Mathematics, 15.10.2019 11:00
question
History, 15.10.2019 11:00
Questions on the website: 13722363