subject
Mathematics, 29.01.2021 01:00 umadbro8404

Apple trees need to be planted in an orchard. The process takes two hours per tree. The orchard owner wants to find out how many apple trees can be planted in a given amount of time. Which graph correctly represents this relationship between time ( y ) and apples trees planted ( x )? Graph D
Graph A
Graph C
Graph B

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:10
Figure abcde is a regular pentagon. segment ae is located at a (2, 1) and e (4, 1). what is the perimeter of abcde? 4 units 6 units 8 units 10 units
Answers: 1
question
Mathematics, 21.06.2019 19:00
What numbers are included in the set of integers? what numbers are not included?
Answers: 2
question
Mathematics, 22.06.2019 01:30
An airplane is flying at an elevation of 5150 ft, directly above a straight highway. two motorists are driving cars on the highway on opposite sides of the plane, and the angle of depression to one car is 35 ̊ and to the other is 52 ̊. how far apart are the cars?
Answers: 2
question
Mathematics, 22.06.2019 01:30
The table below shows the angle measurements for triangle abc and triangle xyz. if triangle abc is similar to triangle xyz, what does angle z equal, in degrees?
Answers: 2
You know the right answer?
Apple trees need to be planted in an orchard. The process takes two hours per tree. The orchard owne...
Questions
question
Mathematics, 07.01.2021 02:20
question
Mathematics, 07.01.2021 02:20
question
Mathematics, 07.01.2021 02:20
question
Mathematics, 07.01.2021 02:20
question
Geography, 07.01.2021 02:20
Questions on the website: 13722363