The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probability distribution for time
estimates. Which is NOT one of the three time estimates the model uses to calculate expected completion time?
les)
A)
Optimistic Time
B)
Most Likely Time
Least Likely Time
D)
Pessimistic Time
Answers: 2
Mathematics, 21.06.2019 13:30
The decibel level of sound is 50 db greater on a busy street than in a quiet room where the intensity of sound is watt/m2. the level of sound in the quiet room is db, and the intensity of sound in the busy street is watt/m2. use the formula , where is the sound level in decibels, i is the intensity of sound, and is the smallest sound intensity that can be heard by the human ear (roughly equal to watts/m2).
Answers: 1
Mathematics, 21.06.2019 16:30
Abox of chocolates costs $7. which equation relates the number of boxes sold (x) and total cost of the boxes sold (y)?
Answers: 2
Mathematics, 21.06.2019 19:00
What is the explicit formula for this sequence? -7, -4, -1, 2, a.) an = 8 + (b - 1)3 b.) an = -7 + (n - 1)3 c.) an = 3 + (n -1) (-7) d.) an = -7 + (n - )
Answers: 1
The project scheduling tool PERT (Program Evaluation and Review Technique) assumes a beta probabilit...
Mathematics, 12.08.2020 08:01
Mathematics, 12.08.2020 08:01
Computers and Technology, 12.08.2020 08:01