D File
C:/Users/tonia/Desktop/YEAR%201.2/A DVANCED%20CALC/BSM%201207% Highlight Erase + Draw 2 A' Read aloud b) A project has the following activities and other characteristics: Activity Preceding Most Most activity optimistic likely Most pessimistic A B С D E F G H 1 А A C С. D B E, F G 4. 1 6 2. 5 3 3 1 7 5 12 5 11 6 9 4 19 16 15 30 8 17 15 27 7 28 Required i) Draw the PERT network diagram. Identify the critical path Determine the mean project completion time. iv) Find the probability that the project is completed in 36 weeks. (16 marks) וחו P 100% 14 here to search
these are pretty self explanatory if you know what supp right and com angles are
Answer from: Quest
im pretty sure its
(8,15)
step-by-step explanation:
Another question on Mathematics
Mathematics, 21.06.2019 17:00
The rumpart family is building a new room onto their house. the width of the new room will be 16 feet. the length of the room will be 4% greater than the width. write an expression to find the length of the new room. what will be the area of this new room?
The students in a class were asked how many siblings they have. the data obtained is represented in the dot plot. the number of students who have no siblings is . the number of students who have three or more siblings is .