subject
Mathematics, 28.12.2020 18:10 mrhortert9348

Calculate the net present value of a project which requires an initial investment of Rs. 243,000 and it is expected to generate a cash inflow of Rs. 50,000 each month for 12 months. Assume that
the salvage value of the project is zero. The target rate of return is 12% per annum.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
The figure below shows rectangle abcd and the triangle eca on a coordinate plane.which of the following expressions represents the perimeter of triangle of triangle eca in units
Answers: 2
question
Mathematics, 21.06.2019 20:00
Which statement about the annual percentage rate (apr) is not true?
Answers: 3
question
Mathematics, 21.06.2019 23:30
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
question
Mathematics, 22.06.2019 00:40
The point (-7, -24) is on the terminal ray of angle 0 which is in standard position. a student found the six trigonometric values for angle e. the student's answers are shown. which value(s) are incorrect? sin(8) cos(8) 24 tan(0) sin(0)=25 cos(0) -- tan(ⓡ) - - 24 csc(o)=2 sec(0) --25 cot(6) - za csc(o) sec(0) cot(0) done
Answers: 3
You know the right answer?
Calculate the net present value of a project which requires an initial investment of Rs. 243,000 an...
Questions
question
Mathematics, 20.12.2020 20:20
question
Biology, 20.12.2020 20:20
Questions on the website: 13722363