Mathematics, 23.12.2020 17:10 simmy6
4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any ramp run shall be 30 inches. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises, if space limitations prohibit the use of a 1:12 slope or less.
Answers: 3
Mathematics, 21.06.2019 21:30
What is the solution to this system of equations? y= 2x - 3.5 x - 2y = -14
Answers: 2
Mathematics, 22.06.2019 01:00
Suppose 38 lbs of coffee beans are required to produce 2 lbs of farmer's coffee. how many lbs of coffee beans are required to produce 309 lbs of farmer's coffee?
Answers: 1
4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ram...
Mathematics, 07.03.2021 03:00
Chemistry, 07.03.2021 03:00
Mathematics, 07.03.2021 03:00
English, 07.03.2021 03:00
Mathematics, 07.03.2021 03:00
Mathematics, 07.03.2021 03:00
Mathematics, 07.03.2021 03:00
Computers and Technology, 07.03.2021 03:00
Advanced Placement (AP), 07.03.2021 03:00
Mathematics, 07.03.2021 03:00
Mathematics, 07.03.2021 03:00