subject
Mathematics, 10.11.2019 20:31 marykatherine

At a toy factory, toy cars are produced on an assembly line. it takes 2.054 s to attach each of the four wheels. it takes 3.652 s to attach the hood.

how long does it take to attach the wheels and hoods on 42 toy cars?

11.868 s
239.652 s
498.456 s
958.608 s

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Given a circle with measures of (c, d, and r) and a circle with measures of (c', d', and r'), what is d if c c' = 12 and d' = 0.50? a) 3 b) 6 c) 12 d) 24
Answers: 2
question
Mathematics, 21.06.2019 18:40
Solve the equation below: (x+4)/6x=1/x a. x=2 b. x=0,2 c. x=-2 d. x=0,-2
Answers: 1
question
Mathematics, 21.06.2019 22:10
What is the circumference of a circle with an area of 50.24 cm²?
Answers: 2
question
Mathematics, 21.06.2019 22:30
My hour hand points between the 8 and the 9 in 35 minutes it will be the next hour. what time is it ?
Answers: 2
You know the right answer?
At a toy factory, toy cars are produced on an assembly line. it takes 2.054 s to attach each of the...
Questions
question
Mathematics, 19.11.2020 19:00
question
Mathematics, 19.11.2020 19:00
question
Mathematics, 19.11.2020 19:00
question
Mathematics, 19.11.2020 19:00
question
Mathematics, 19.11.2020 19:00
question
History, 19.11.2020 19:00
Questions on the website: 13722367