subject
Mathematics, 09.12.2020 08:30 tus

The number of machine parts produced at a manufacturing plant is based on the number of parts made in a given day and the number of hours worked. Let P = 14x2 + 100 give the number of parts that are produced since the start of the shift and H = x be the number of hours that are to be worked that particular day. Create the equation that would give the number of parts produced per hour.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:10
The number of chocolate chips in an 18-ounce bag of chocolate chip cookies is approximately normally distributed with a mean of 1252 chips and standard deviation 129 chips. (a) what is the probability that a randomly selected bag contains between 1100 and 1500 chocolate chips, inclusive? (b) what is the probability that a randomly selected bag contains fewer than 1125 chocolate chips? (c) what proportion of bags contains more than 1225 chocolate chips? (d) what is the percentile rank of a bag that contains 1425 chocolate chips?
Answers: 1
question
Mathematics, 21.06.2019 18:20
F(n + 1) = f(n) – 8. if f(1) = 100, what is f(6)?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Erin bought christmas cards for $2 each to send to her family and friends. which variable is the dependent variable?
Answers: 1
question
Mathematics, 21.06.2019 21:00
Apiling for a high-rise building is pushed by two bulldozers at exactly the same time. one bulldozer exerts a force of 1250 pounds in a westerly direction. the other bulldozer pushes the piling with a force of 2650 pounds in a northerly direction. what is the direction of the resulting force upon the piling, to the nearest degree? a. 65 n of w b. 25 n of w c. 45 n of w d. 35 n of w
Answers: 1
You know the right answer?
The number of machine parts produced at a manufacturing plant is based on the number of parts made i...
Questions
question
Mathematics, 23.11.2019 03:31
question
Physics, 23.11.2019 03:31
Questions on the website: 13722359