subject
Mathematics, 20.11.2020 04:40 cruzc2

A machine at a manufacturing company can make 72 jar lids in 3 minutes 15 points and 288 jar lids in 12 minutes. If the number of jar lids and the time are in a proportional linear relationship, at what rate is the machine manufacturing the lids? * Your answer

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
If i have a 24 in loaf of bread and i cut it into two pieces one 9 in how long was the other
Answers: 2
question
Mathematics, 22.06.2019 02:30
The taxi fare in gotham city is $2.40 for the first 1 2 12 mile and additional mileage charged at the rate $0.20 for each additional 0.1 mile. you plan to give the driver a $2 tip. how many miles can you ride for $10?
Answers: 3
question
Mathematics, 22.06.2019 03:00
The first triangle is dilated to form the second triangle. select true or false for each statement. statement true false the scale factor is 0.625. the scale factor is 1.6. a right triangle with a side length of .5. an arrow points to a larger right triangle with a side length of .8
Answers: 3
question
Mathematics, 22.06.2019 04:20
1. suppose that scores on a knowledge test are normally distributed with a mean of 71 and a standard deviation of 6. a. label the curve: show the mean and the value at each standard deviation: b. if angelica scored a 76 on the test, what is her z-score? (draw her score on the curve above and label) c. what percent of students did angelica score higher than? how can you tell? d. if 185 students took the test, how many students scored higher than angelica?
Answers: 3
You know the right answer?
A machine at a manufacturing company can make 72 jar lids in 3 minutes 15 points and 288 jar lids in...
Questions
Questions on the website: 13722363