Mathematics, 10.01.2020 03:31 Jenifermorales101

Aroad construction crew is resurfacing the highway between point d and point e. the distance between point d and point e is 93 miles of road. the crew has completed 35 miles. if they work at a pace of 2.9 miles per day, how many more days will it take to finish?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
John read the first 114 pages of a novel, which was 3 pages less than 1/3 of the novel. write an equation to determine the total number of pages (p)(p) in the novel.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Human body temperatures have a mean of 98.20° f and a standard deviation of 0.62°. sally's temperature can be described by z = 1.4. what is her temperature? round your answer to the nearest hundredth. 99.07°f 97.33°f 99.60°f 100.45°f
Answers: 1
question
Mathematics, 21.06.2019 19:50
The probability that an adult possesses a credit card is .70. a researcher selects two adults at random. by assuming the independence, the probability that the first adult possesses a credit card and the second adult does not possess a credit card is:
Answers: 3
question
Mathematics, 21.06.2019 23:50
The graph of a curve that passes the vertical line test is a:
Answers: 3
You know the right answer?
Aroad construction crew is resurfacing the highway between point d and point e. the distance between...
Questions
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
question
Mathematics, 18.03.2021 02:00
Questions on the website: 13722363