Mathematics, 18.11.2020 06:10 Jasten
A company manufactures three products A, B and C, which require three raw
materials I, II and III. The table given below shows the amount of raw materials required
per kg of each product. The resource availability per day and the profit contribution for
each product is also given.
Product
A B
Availability (Kg)
С C
Raw Material
4
1
800
6
I
5
6
8
1,500
II
2
4
1
1,200
9
10
6
Profit Per Unit (1)
i. Formulate the problem as a linear programming problem.
ii. Solve the problem and determine the optimal product mix
Answers: 2
Mathematics, 21.06.2019 13:00
Which values for a and b will create infinitely many solutions for this system of equations? ax-y=8 2x+y=b
Answers: 2
Mathematics, 22.06.2019 03:00
Define the type of sequence below. -2,0,2,4,6 a. both arithmetic and geometric b. arithmetic c. neither arithmetic nor geometric d. geometric
Answers: 3
Mathematics, 22.06.2019 03:00
Find the slope of the line that passes through the points (0, 0) and (-2, -3). 2/3 3/2 -3/2
Answers: 2
Mathematics, 22.06.2019 08:00
Jose correctly answered 80% of the questions on a language arts quiz. if he answered 16 questions correctly, how many questions were on the language arts quiz?
Answers: 1
A company manufactures three products A, B and C, which require three raw
materials I, II and III....
Mathematics, 19.03.2020 07:20
Chemistry, 19.03.2020 07:20
Mathematics, 19.03.2020 07:20
Biology, 19.03.2020 07:20
English, 19.03.2020 07:20
English, 19.03.2020 07:21