subject
Mathematics, 17.11.2020 21:20 trinitymarielouis

Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do process A in 1
minute, B in 2 minutes, and C in 3 minutes. You have two A machines, one B machine, and three C machines. Which process is the bottleneck?
(can produce the fewest items per unit time)?

A) process a
B) process b
C) process c

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Stacey filled her 1/2 cup of measuring cup seven times to have enough flour for a cake recipe how much flour does the cake recipe calls for
Answers: 2
question
Mathematics, 21.06.2019 22:00
Need showing work for this problem 56.25 ×25.80
Answers: 1
question
Mathematics, 21.06.2019 22:30
Using the figure below, select the two pairs of alternate interior angles.a: point 1 and point 4 b : point 2 and point 3 c: point 6 and point 6d: point 5 and point 7
Answers: 2
question
Mathematics, 21.06.2019 22:30
The party planning committee has to determine the number of tables needed for an upcoming event. if a square table can fit 8 people and a round table can fit 6 people, the equation 150 = 8x + 6y represents the number of each type of table needed for 150 people.
Answers: 1
You know the right answer?
Your manufacturing requires parts to go sequentially through process A, B, and C. A machine can do...
Questions
question
Mathematics, 23.03.2020 06:22
question
Mathematics, 23.03.2020 06:22
question
Mathematics, 23.03.2020 06:22
question
Mathematics, 23.03.2020 06:22
question
Mathematics, 23.03.2020 06:22
question
Mathematics, 23.03.2020 06:23
question
Mathematics, 23.03.2020 06:23
question
Mathematics, 23.03.2020 06:23
question
Spanish, 23.03.2020 06:24
Questions on the website: 13722363