A worker can clean a pool in four hours less time than it takes another worker. If the men work together the job takes 8/3 hours. How long would it take the slower man working alone? * A. 6 hours
B. 8 hours
C. 7 hours
D. 4 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:20
The edge of a cube was found to be 30 cm with a possible error in measurement of 0.4 cm. use differentials to estimate the maximum possible error, relative error, and percentage error in computing the volume of the cube and the surface area of the cube. (round your answers to four decimal places.) (a) the volume of the cube maximum possible error cm3 relative error percentage error % (b) the surface area of the cube maximum possible error cm2 relative error percentage error %
Answers: 3
question
Mathematics, 21.06.2019 22:00
If rs 900 amounts to rs 1044 in 4 years, what sum will amount to 1368 in 3 1/2 years at the same rate
Answers: 3
question
Mathematics, 21.06.2019 22:30
Aright triangle has an area of 21 m2. the dimensions of the triangle are increased by a scale factor of 4. what is the area of the new triangle
Answers: 3
question
Mathematics, 21.06.2019 22:30
Reinel saves 30% of every pay check. his paycheck last week was 560$. how much did reniel save last week?
Answers: 2
You know the right answer?
A worker can clean a pool in four hours less time than it takes another worker. If the men work toge...
Questions
question
Biology, 05.05.2020 10:57
question
History, 05.05.2020 10:57
question
Mathematics, 05.05.2020 10:57
question
Mathematics, 05.05.2020 10:57
question
Social Studies, 05.05.2020 10:57
question
Mathematics, 05.05.2020 10:57
Questions on the website: 13722367