subject
Mathematics, 30.10.2020 01:00 jorgepas66

A construction company can remove 7 1 / 2
metric tons of dirt from a construction site in 3 1/8 hours.
What is the unit rate in metric tons per hour?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
For a field trip to the zoo, 4 students rode in cars and the rest filled nine busess. how many students were in each bus if 472 students were on the trip
Answers: 1
question
Mathematics, 21.06.2019 18:00
Janie has $3. she earns $1.20 for each chore she does and can do fractions of chores. she wants to earn enough money to buy a cd for $13.50. write an inequality to determine the number of chores, c, janie could do to have enough money to buy the cd.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
question
Mathematics, 21.06.2019 22:10
What’s the range cuz i can’t find it?
Answers: 3
You know the right answer?
A construction company can remove 7 1 / 2
metric tons of dirt from a construction site in 3 1...
Questions
question
English, 20.05.2021 01:00
question
Mathematics, 20.05.2021 01:00
question
English, 20.05.2021 01:00
Questions on the website: 13722363