Please help !
the last question is
...
Answers: 2
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 01:30
At store a, erasers are sold individually. the cost y of x erasers is represented by the equation y=0.75x. the costs of erasers at store b are shown in the graph.
Answers: 2
Mathematics, 22.06.2019 03:00
When you dilate a figure with a scale factor of 1/2, what will the dilated figure look like? a: the dilated figure will have side lengths that are half the length of the original side lengths. b: the angles in the dilated figure will be half the measure of the original figure. c: the dilated figure will have side lengths twice the length of the original.
Answers: 2
Social Studies, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Physics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Mathematics, 10.12.2019 08:31
Chemistry, 10.12.2019 08:31