subject
Mathematics, 27.10.2020 03:20 Shazrts2371

Two groups of workers are painting a bridge in the bay. The first group is responsible for painting the north side of the bridge, and the second group is responsible for painting the
south side of the bridge. The first group has already painted 5 kilometers of the bridge and is
painting 2 additional kilometers per day. The second group has already painted 1 kilometer of
the bridge and is painting 4 additional kilometers per day. After a while, the two groups will
have painted the same amount of the bridge. How much of the bridge will each group have
painted? How long will that take?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
What number produces an irrational number when multiplied by -1.25
Answers: 2
question
Mathematics, 21.06.2019 16:30
Anyone know? will mark brainliest if you're correct!
Answers: 1
question
Mathematics, 21.06.2019 23:00
Solve for n. round to the tenths place, if necessary. 14.2 cups of flour6 loaves of bread= 20 cups of flour n
Answers: 2
question
Mathematics, 21.06.2019 23:00
Find the distance between c and d on the number line c=3 and d=11
Answers: 1
You know the right answer?
Two groups of workers are painting a bridge in the bay. The first group is responsible for painting...
Questions
question
Mathematics, 20.02.2021 19:20
question
English, 20.02.2021 19:20
Questions on the website: 13722367