Anne is choosing a contractor. She has narrowed down her selection to two companies and will base her decision on the likelihood that the job is done on
time and on budget. She uses online reviews to estimate the probabilities.
Contractor A
Contractor B
0.93
0.97
Probability that the job
is done on time
0.98
0.96
Probability that the job
is done within budget
Which contractor should Anne choose to maximize the probability that the job
will be done on time and on budget? Assume all events are independent.
A. Contractor B. The probability that both conditions are met is 0.93
B. Contractor A. The probability that both conditions are met is 0.91
C. Contractor B. The probability that both conditions are met is 0.97

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Iwill give brainliest only if your correct the words subsequent and submerge both contain the prefix sub. based on this information, what does the prefix sub most likely mean? a) under or secondary b) true or verifiable c) tricky or difficult d) around or centered on
Answers: 1
question
Mathematics, 21.06.2019 17:00
The vet charges $45 for an office visit and $10 for each vaccination your dog needs. write an eaquation
Answers: 1
question
Mathematics, 21.06.2019 18:30
If you have the following equation, 2/3x+5/6-x=2-3/4x what would you multiply each term by to get rid of all the fractions
Answers: 3
question
Mathematics, 21.06.2019 19:00
Use the quadratic formula to solve the equation. if necessary, round to the nearest hundredth. x^2 - 20 = x a. 5, 4 b. -5, -4 c. -5, 4 d. 5, -4
Answers: 2
You know the right answer?
Anne is choosing a contractor. She has narrowed down her selection to two companies and will base h...
Questions
question
Social Studies, 08.07.2019 09:50
question
Chemistry, 08.07.2019 09:50
Questions on the website: 13722367