subject
Mathematics, 20.10.2020 15:01 supertailsninja453

A contractor bought 6.4 ft2 of sheet metal. He has used 2.1 ft2 so far and has $77.40 worth of sheet metal remaining. The equation 6.4x - 2.1x = 77.4 represents how much sheet metal is
remaining and the cost of the remaining amount. How much does sheet metal cost per square
foot?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The magnitude, m, of an earthquake is defined to be m=log l/s, where i is the intensity of the earthquake (measured by the amplitude of the seismograph wave) and s is the intensity of a “standard” earthquake, which is barely detectable. what is the magnitude of an earthquake that is 1,000 times more intense than a standard earthquake? use a calculator. round your answer to the nearest tenth.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Find the zeros of each function. f(x) = 6x^2 - 7x - 20
Answers: 1
question
Mathematics, 21.06.2019 22:30
Adeposit of 5500 at 6% for 3 years equals
Answers: 2
question
Mathematics, 21.06.2019 23:00
According to the general equation for conditional probability if p(anb)=3/7 and p(b)=7/8 what is p(a i b)
Answers: 1
You know the right answer?
A contractor bought 6.4 ft2 of sheet metal. He has used 2.1 ft2 so far and has $77.40 worth of shee...
Questions
question
Chemistry, 16.07.2019 03:30
Questions on the website: 13722360