Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:00
Select the correct answer from each drop-down menu. consider the following polynomials equations. 3x^2(x-1) and -3x^3+ 4x^2-2x+1 perform each operation and determine if the result is a polynomial. is the result of a + b a polynomial? yes or no is the result of a - b a polynomial? yes or no is the result of a · b a polynomial? yes or no
Answers: 1
Mathematics, 21.06.2019 22:30
What is the distance from zero if a quadratic function has a line of symmetry at x=-3 and a zero at 4
Answers: 1
Can someone awsner this for me honestly I’m sorry but I really need these awsner but I need the answ...
Chemistry, 02.12.2020 01:00
Physics, 02.12.2020 01:00
Arts, 02.12.2020 01:00
Mathematics, 02.12.2020 01:00
Mathematics, 02.12.2020 01:00
History, 02.12.2020 01:00
Mathematics, 02.12.2020 01:00
Mathematics, 02.12.2020 01:00
Mathematics, 02.12.2020 01:00
Health, 02.12.2020 01:00
Law, 02.12.2020 01:00