A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. Each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 millers. Assume that each machine operates a maximum of 4500 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
10 ! in a race, nick is 50 feet in front of jay after ten seconds. how fast can nick run, if jay can run 20 feet per second?
Answers: 1
question
Mathematics, 21.06.2019 20:40
Which function has an inverse function? a.f(x)= |x+3|/5 b. f(x)= x^5-3 c. f(x)= x^4/7+27 d. f(x)= 1/x²
Answers: 1
question
Mathematics, 21.06.2019 20:50
The cost of turkey is directly proportional to its weight. if a 12-pount turkey costs $27, how much does a 16-pound turkey cost? a. $33.75 b. $36.00 c. $31.00 d. $32.50
Answers: 3
question
Mathematics, 21.06.2019 21:30
Three people are traveling and need to exchange the currency of their native country for the currency of the country they are visiting. drag each exchange to the category that shows the ratio of currencies in that exchange.
Answers: 2
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
Questions on the website: 13722367