subject
Mathematics, 20.09.2020 03:01 pierreangie17

It was calculated that 75 men can complete a piece of work in 20 days. when work was scheduled to commence, it was found necessary to send 25 men to another project. how much longer will it take to complete the work?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Can someone check if i did this correct. it’s number 4 if you’re wondering.
Answers: 1
question
Mathematics, 21.06.2019 22:30
If a line is defined by the equation y = 5x + 2, what is the slope?
Answers: 2
question
Mathematics, 22.06.2019 00:30
Which of these side lengths could form a triangle a) 2 cm , 2 cm , 4 cm b) 3 cm , 5 cm , 10 cm c) 3 cm , 4 cm , 5 cm d) 4 cm , 8 cm , 15 cm
Answers: 1
question
Mathematics, 22.06.2019 01:30
△abc is similar to △xyz. also, side ab measures 6 cm, side bc measures 18 cm, and side xy measures 12 cm. what is the measure of side yz ? enter your answer in the box.
Answers: 2
You know the right answer?
It was calculated that 75 men can complete a piece of work in 20 days. when work was scheduled to co...
Questions
question
Biology, 06.11.2020 14:00
question
History, 06.11.2020 14:00
question
Biology, 06.11.2020 14:00
question
Mathematics, 06.11.2020 14:00
question
Mathematics, 06.11.2020 14:00
question
Mathematics, 06.11.2020 14:00
Questions on the website: 13722363