subject
Mathematics, 20.09.2020 03:01 twixer29

During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of bentonite to be mixed with 198 lb of concrete mixed every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:20
Alana has 12.5 cups of flour with which she is baking four loaves of raisin bread and one large pretzel. the pretzel requires 2.5 cups of flour to make. how much flour is in each loaf of raisin bread? explain the steps to follow to get the answer.
Answers: 3
question
Mathematics, 22.06.2019 03:20
Solve this system of equations: y=x2-3x + 12 y=-2x+14 4. substitute the values of x, -1 and 2, into either origina equation to solve for the values of y. what are the solutions of the system of equations?
Answers: 3
question
Mathematics, 22.06.2019 04:30
What’s the nearest hundredth of 1.5757
Answers: 2
question
Mathematics, 22.06.2019 06:10
Which statements are true for the functions g(x)= x^2 and h(x) = -x^2? check all that apply
Answers: 3
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
Questions
Questions on the website: 13722366