A project manager is calculating work forecasts. The manager's team completed of a job in 16 days. At this rate,
the manager says that the team completed of the project each day.
What was the manager's error?
The manager is correct. There was no error.
O The manager divided by 16 instead of dividing
O The manager divided 16 by instead of dividing by 16.
The manager divided 16 by instead of multiplying 16 by
The manager divided by 16 instead of multiplying 16 by
by 16
Answers: 3
Mathematics, 21.06.2019 16:30
What is true about the dilation? it is a reduction with a scale factor between 0 and 1. it is a reduction with a scale factor greater than 1. it is an enlargement with a scale factor between 0 and 1. it is an enlargement with a scale factor greater than 1.
Answers: 2
Mathematics, 21.06.2019 20:30
What is the best approximation for the area of a circle with a radius of 4 m ? use 3.14 to approximate pi
Answers: 1
Mathematics, 22.06.2019 04:30
What is the equation for the line that passes through the points (-6,4) and (-2,9) answer in point slope form
Answers: 2
Mathematics, 22.06.2019 04:30
What is the hypotenuse of a triangle with 4 ft and 5 ft
Answers: 1
A project manager is calculating work forecasts. The manager's team completed of a job in 16 days. A...
English, 20.01.2021 17:00
Biology, 20.01.2021 17:00
Biology, 20.01.2021 17:00
Biology, 20.01.2021 17:00
Mathematics, 20.01.2021 17:00
Mathematics, 20.01.2021 17:00
Mathematics, 20.01.2021 17:00
Health, 20.01.2021 17:00
Biology, 20.01.2021 17:00