subject
Mathematics, 26.07.2020 14:01 ochoachanna

Cerra Co. expects to receive 5 million euros tomorrow as a result of selling goods to the Netherlands. Cerra estimates the standard deviation of daily percentage changes of the euro to be 1 percent over the last 100 days. Assume that these percentage changes are normally distributed. Use the value-at-risk (VaR) method based on a 95 percent confidence level. What is the maximum one-day percentage loss if the expected percentage change of the euro tomorrow is 0.5 percent

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
F(x)= 1/x-4, g(x)=4x+1/x a. use composition to prove whether or not the functions are inverses of each other. b. express the domain of the compositions using interval notation.
Answers: 2
question
Mathematics, 21.06.2019 16:00
Apark is in the shape of a rectangle. the park authorities are planning to build a 2-meter-wide jogging path in the park (shown as the shaded region in the image). what is the area of the jogging path? plz
Answers: 1
question
Mathematics, 22.06.2019 00:00
The construction of copying qpr is started below. the next step is to set the width of the compass to the length of ab. how does this step ensure that a new angle will be congruent to the original angle?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Talia took the bus from her home to the bank and then walked back to her home along the same route. the bus traveled at an average speed of 40 km/h and she walked at an average speed of 5 km/h. to determine the time, x, that it took talia to walk home, she used the equation 40(0.9 – x) = 5x. the time of trip 2 is hours. the distance of trip 1 is km.
Answers: 1
You know the right answer?
Cerra Co. expects to receive 5 million euros tomorrow as a result of selling goods to the Netherland...
Questions
question
Mathematics, 13.06.2020 04:57
question
Mathematics, 13.06.2020 04:57
Questions on the website: 13722363