subject
Mathematics, 24.07.2020 20:01 princesskoi1910

The length of time a full length movie runs from opening to credits is normally distributed with a mean of 1.9 hours and standard deviation of 0.3 hours. Calculate the following: A random movie is between 1.8 and 2.0 hours. A movie is longer than 2.3 hours. The length of movie that is shorter than 94% of the movies

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
What is the most accurate measurement of 1 pound
Answers: 1
question
Mathematics, 21.06.2019 17:30
F(x)= 4x g(x) =x-1 what is f(x) divided by g(x)
Answers: 2
question
Mathematics, 21.06.2019 19:00
The diagonals of a quadrilaretral intersect at (-1,4). one of the sides of the quadrilateral is bounded by (2,7) and (-3,5) determine the coordinates of the other side in order for the quadrilaretral to be a square.
Answers: 1
question
Mathematics, 21.06.2019 22:30
An 18% discount on a watch saved a shopper $72. find the price of the watch before the discount
Answers: 1
You know the right answer?
The length of time a full length movie runs from opening to credits is normally distributed with a m...
Questions
question
Mathematics, 03.12.2019 01:31
Questions on the website: 13722366